NG Charlotte Project – Underground Detention System

NG Charlotte Project

Challenge

The NG Charlotte Project presented several operational challenges from the start. First, the underground detention system contained a massive amount of accumulated debris, which prevented the system from passing inspection. As a result, the team needed to remove the material quickly while maintaining strict safety procedures.

In addition, crews had to perform the work inside a confined underground environment. Therefore, they followed strict Confined Space safety protocols and coordinated every step carefully to protect workers and maintain compliance. At the same time, the project schedule remained aggressive. The NG Charlotte Project required the team to complete the cleaning and debris removal within a tight two-week timeframe, which meant working extended 10-hour shifts and weekends to stay on schedule.

Ultimately, the combination of heavy debris, confined space requirements, and a demanding deadline made the NG Charlotte Project a complex operation that required careful planning, experienced crews, and efficient execution.

Solution

To address the challenge, the team ran 300 feet of hose from the Hydrovac directly into the underground system. As a result, they cleaned the structure chamber by chamber and aisle by aisle. In addition, they used job-specific tools and worked in coordinated shifts to maintain steady progress. Through this approach, the crew removed two to three loads of debris each day while maintaining both efficiency and strict safety standards.

Result

Through strategic planning and consistent effort, NG Companies successfully cleared the underground system of debris and ensured it passed inspection. As a result, the team completed the project within the two-week deadline. Ultimately, the work demonstrated the crew’s strong commitment to safety, efficiency, and high-quality results, even under challenging conditions.


Project Location Charlotte, NC

Division Location Charlotte, NC

Services Provided Hydrovac

Project Length 10 Days