Battery Expansion
NG Oil & Gas was contracted out of our Wyoming office to perform a battery expansion after additional wells were drilled. Our team performed the above-listed operations on an active frac site, utilizing heavy equipment and cranes to successfully install all new infrastructure. These operations required constant vigilance and communication with all contractors on-site to maintain safe and efficient workflow for all parties.
We installed additional production tanks, removed framed wall from treater facility to allow for additional treater installation, installed new treaters, framed and expanded treater enclosure, fabricated new flowlines, installed flowlines, gas lift lines, gas lift compressor, sales meter, and gas buyback meter.